Descargar Imprimir esta página

Mechanical Installation With Docking Station; Connecting The Fieldbus Interface; Closing The Instrument; Increased Safety (Ex E) Installation - With Docking Station - Dräger Polytron 8000 Serie Instructions For Use

Ocultar thumbs Ver también para Polytron 8000 Serie:

Publicidad

Idiomas disponibles

Idiomas disponibles

en

Increased safety (Ex e) installation - with Docking Station

2. Connect the three wires for power and signal to the
appropriate terminal as indicated in the wiring table and
figure.
3. Plug connector back into socket and tighten screws.
4. Close the instrument, see 4.2.9 Closing the instrument.
4.2.7 Grounding
To ground fieldbus and modbus connections refer to the
corresponding technical manual.
1. Ground the enclosure of the instrument locally at the
grounding lug, see figures G and H on the fold-out page..
2. Connect the shield of the wires only to the instrument
earth ground of the controller (e g. chassis, ground
busbar, etc.).
Unless special measures are taken (e. g. capacitive
earthing), the shield must only be connected at one end.

4.2.8 Connecting the fieldbus interface

1. Pull off the 2-pin and 4-pin connector.
2. Connect the two wires for power and the four wires for
signal to the appropriate terminals as indicated in the
wiring table and figure.
3. Plug connector back into socket and tighten screws.
4. Close the instrument, see 4.2.9 Closing the instrument.
For further information regarding the fieldbus interface
installation consult the corresponding Technical Handbook.

4.2.9 Closing the instrument

1. Ensure the following connections are properly made:
a. Wiring screws are tightened to the correct torque.
b. All cable connectors are secured with screws.
c. The sensor connector is plugged.
d. The grounding cable coming from the enclosure is
connected to the lug on the PCB unit, see figures G
and H on the fold-out page.
2. Place PCB unit back into the enclosure.
3. Screw the lid back on, until it is seated with correct torque,
and tighten set-screw.
5
Increased safety (Ex e) installation
- with Docking Station
Obey the safety statements mentioned in 1.3 Mechanical
installation!
The Docking Station can be pre-mounted, wired and sealed
with the supplied cover. Once the site is ready for
commissioning, the instrument is then hooked up to the
Docking Station and taken into operation; avoiding that the
instrument is damaged during the construction phase.
The connection between the Docking Station and the main
instrument is realized via a 'feedthrough'. Depending on the
instrument selected, there are 3 types of feed-through.
– feedthrough 3 wires for power
– feedthrough 9 wires for power and relay
– feedthrough 14 wires for power, interface connections or
relay and remote sensor (not for Polytron
5.1
Mechanical installation with Docking
Station
The transmitter can be mounted for measuring gases in
ambient air or inside of a duct/pipe.
1. Mount the Docking Station to one of the following options.
Option
Mounting on a flat surface
Mounting on a pole
Mounting on a duct/pipe
To mount the transmitter on the Docking Station:
1. Pull hinge pin out of the Docking Station.
2. Align the boss of the transmitter with the boss of the
Docking Station and push the hinge back in.
 The transmitter is now supported and can swivel to
give access to the wiring.
3. Install the electrical wiring see instructions for use of the
docking station (9033242).
4. Securely screw the transmitter onto the Docking Station
using 4 screws with a tightening torque of 8 Nm (70 LB
IN.). The 4 screws are part of the delivery (M6, 1/4" bolts
with hex socket caps).
5.2
Electrical installation with docking
station
1. Refer to Instructions for Use 9033242.
6

Installation of sensors

6.1
Installing EC sensor
See figure C on the fold-out page.
This point is only valid for Polytron
1. If the instrument is already in operation, activate the
function to change the sensor (Sensor change function).
Otherwise, a fault is displayed when the sensor is
deplugged.
2. Loosen set-screw, 2mm Allen screw.
3. Unscrew bayonet ring and remove blank or old sensor.
4. Insert sensor into the opening. The Dräger logo on the
sensor must point to the mark on the sensing head
housing.
5. Lock sensor with bayonet ring.
6. Tighten set-screw.
Mandatory for Zone 22 installations.
®
8100 EC)
Drilling template 4544299
Pole mount kit 4544198
Duct mount kit 6812725
®
For Polytron
87x0 IR:
6812300
®
8100 EC
®
Dräger Polytron
8000 Series

Publicidad

loading