16
INSTALL THE MAIN COOKING SURFACES
Parts required:
2 x Porcelain Coated Cast Iron Main Cooking Grids
2 x Porcelain Coated Steel Upper Racks
1 x Porcelain Coated Steel Upper Rack
Installation:
•
Slip main grids into place
•
Set upper cooking grids into appropriate grid holders.
17
INSTALL THE RACK SUPPORTS
Parts required:
2 x Porcelain coated rack support - short
2 x Porcelain coated rack support - tall
Installation:
Step 1 - Upper Support Racks
•
Start with the two (2) shorter rack supports, these will be
installed in the upper cabinet.
•
Hold the rack on a slight angle, and insert the top hooks
into the holes provided in the cabinet.
•
Slide the rack upwards, to line up the bottom hooks with
the holes provided in the cabinet.
•
Insert the bottom hooks, ensure a secure fit.
Step 2 - Smoker Cabinet Support Racks
•
The two (2) larger rack supports are to be installed similar
to the upper support racks.
18
INSTALLING THE OVEN RACKS
Parts required:
6 x Porcelain coated steel oven racks
Installation:
•
Simply slide any number of racks into the support racks to
configure to your cooking needs.
19
INSTALL THE STEAMER BOX
Parts required:
1 x Steamer box main body
1 x Steamer lid
Installation:
The steamer box is designed to fit onto the flame broiler and below the main cooking grids. The fan forced convection air along
with the hot liquids, making it the perfect accessory for steaming, not only in the main barrel but in the additional cabinets as
well.
16