Winterizing; Spring Start-Up; Inspection And Service; Owner Inspection - Jandy JE Serie Manual De Instalación Y Operación

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Page 22
ENGLISH
Free Chlorine or
Bromine
pH
Total Alkalinity (TA)
Calcium Hardness (CH)
Cyanuric Acid
Total Dissolved Solids (TDS)
* Concentration levels taken from "Basic Pool and Spa Technology" published by APSP (Association of Pool and
Spa Professionals).
6.2

Winterizing

CAUTION
Failure to winterize could cause damage to the
heat pump and will void the warranty.
In areas where freezing temperatures occur, you should
protect your pump, filter, and heat pump from the ele-
ments. Perform the following steps to completely drain
the heat pump (see Figure 15).
1.
Turn off the electrical power to the heat pump at
the main breaker panel.
2.
Shut off the water supply to the heat pump.
3.
Disconnect the water inlet and outlet unions as
well as the winterizing drain plug (if applicable)
located on the lower front panel of the heat pump.
The heat exchanger will drain through these water
connections.
4.
Cover only the top of the heat pump to prevent
debris from falling into the unit. Do not wrap the
sides of the heat pump with any plastic or other
material that will retain heat or moisture inside
the unit.
6.3

Spring Start-Up

If your heat pump has been winterized, perform the
following steps when starting the system in the Spring:
1.
Uncover the heat pump and inspect the top and
sides for any debris or structural problems.
2.
Connect the water inlet and outlet unions located
on the lower front panel of the heat pump.
3.
Turn on the filter pump to supply water to the
heat pump. Circulate water through the system
long enough to cycle all of the pool water through
the filter. Check for leaks in and around the heat
pump.
4.
Check the pool chemistry and balance as
necessary.
5.
Turn on the electrical power to the heat pump at
the main breaker panel.
Jandy
®
JE Heat Pumps
Table 3. Optimal Water Chemistry Ranges
Test
|
Installation and Operation Manual
Recommended Level
1.0 to 3.0 ppm
2.0 to 4.0 ppm
7.2 to 7.8 (Ideal ranges being between 7.4 and 7.6)
80 to 120 ppm
175 to 400 ppm
30 to 50 ppm
1000 to 2000 ppm (Excluding dissolved NaCl from Salt
Chlorine Generator)
6.4

Inspection and Service

Zodiac
heat pumps are designed and constructed
®
to provide long performance life when installed and
operated properly under normal conditions. Periodic
inspections are important to keep your heat pump
running safely and efficiently through the years.

Owner Inspection

Do not use this heat pump if any part has been
under water. Immediately call a qualified service
technician to inspect the heater and replace any
part of the control system which has been under
water.
Zodiac recommends that you inspect your heat pump
on a regular basis and especially after abnormal weather
conditions. The following basic guidelines are suggest-
ed for your inspection:
1.
Keep the top and surrounding areas of the heat
pump clear of all debris.
2.
Keep all plants and shrubs trimmed and away from
the heat pump.
The heat pump will produce condensation (water) while
in operation. The heat pump base is designed to allow
the condensation to exit through the bottom drain port
when the unit is running. The condensation will increase
as the outdoor air humidity level increases. Check
the following at regular intervals to ensure proper
condensate drainage:
1.
Visually inspect and clear the bottom drain ports
of any debris that could clog the ports.
2.
Ensure that condensate water does not puddle
inside the heat pump
3.
Ensure that condensate run-off is properly directed
away from the equipment pad to keep it from
undermining the pad.
CAUTION

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido