Erreka VULCAN S Manual Del Instalador página 56

Accionador hidráulico para puertas batientes
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

INSTALLATION
Connect the motor to the switchboard
CLOSE OPEN
P1 P2 P3
P4 P5 P6
P15 P14 P16
ST1
FT1
ST2
FT2
FCA1
FCC1
1
Motor connection (common)
2
Motor connection (turning 1)
3
Motor connection (turning 2)
4
Earth
5
Safety device connection
6
Safety device connection
Position the end cap and tighten the gland
52
Installation manual
G1
G2
G3
P7 P8
P11 P12
P22 P23
G7 G8
G9 G10
Courtesy
LOCK
24Vac
Lamp.
MOTOR1 (G2-G1-COM)
STOP
Light
VIVO- M101:
230Vac/ 50Hz
VIVO- M101M:
125Vac/ 60Hz
Before making any electrical connections,
check the switchboard instructions manual.
We recommend using switchboard VIVO-D101(M).
1 Connect the operator (VUS) to the switchboard.
2 Connect the capacitor (C) in cable connectors Turn
1 and Turn 2.
3 Connect the closing limit switch (FCC).
The FCC allows the switchboard to distinguish
between a collision with an obstacle and with a
N
L
POWER
stopper on closing.
4 Connect the switchboard to the electricity supply.
N L
5 Activate the power supply switch.
Before carrying out any gate movement,
ensure there is no person or object in the radius
of action of the gate and the drive mechanisms.
P140W1
6 Use the switchboard mini-pushbuttons (CLOSE-
OPEN) to check the motor connections are correct
(turning direction).
If
the
interchange the cables 2 and 3.
Ensure the earth cable is properly connected.
1 Position the end cap (1) in its housing (2) and attach
using the screws (3).
2 Tighten the gland (4) to ensure the electrical cable
input (5) is seal tight.
turning
direction
is
not
correct,

Publicidad

Tabla de contenido
loading

Tabla de contenido