Dal Zotto MARTA IDRO 2.0 Manual Del Usuario página 55

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

ROUTINE MAINTENANCE
The images are for illustration purposes.
E
D
F
C
E
C
B
A
E
A
Fumes motor (disassembly and cleaning and fumes
pipe and "T"), new silicone in required points
B
Inspections of gaskets, ash drawer and door
(replace them and apply silicone where required)
C
Combustion chamber & heat exchanger (full
cleaning) and ignition plug duct cleaning
D
Tank (complete emptying and cleaning).
E
*Room air fan disassembly and removal of dust
and any pellet debris
F
Air intake pipe inspection and any ow sensor
cleaning
ENGLISH
D
F
55

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Jole idro 2.0

Tabla de contenido