Step 3b – Water Days Setup for Interval Schedule
Use the Right
arrow to navigate WATERS EVERY parameter. Use the Up
watering interval (e.g. 02 for every other day, 03 for every three days).
Press Down
to select the CURRENT DAY menu. Use the Up
designation (e.g. 1 for today, 2 for day two).
e Interval Schedule type waters on the last day of the selected interval. For instance, if the selection is made to water
every 4 days, watering will occur on the last, or 4th day of that interval.
decide where they are in that 4-day interval. For example, if they select CURRENT DAY to be 01, then the schedule will
call for water in 4 days, the last day of the 4-day interval. If the Current Day is set to 03, then the schedule will call for water
tomorrow, the last day of the 4-day interval.
Note:
e fertilizer pump schedule, if setup, will operate every watering day when the Interval Schedule type is selected.
SCHEDULE A
TYPE
INTERVAL
WATER DAYS
SCHEDULE STARTS
VALVE RUNTIME
Step 3c – Water Days Setup for Looping Schedule
Looping schedule is automatically set to water every day and only during the speci ed start and end time. No additional option
is available for Looping.
SCHEDULE A
TYPE
LOOPING
WATER DAYS
SCHEDULE STARTS
VALVE RUNTIME
Step 4
– Press SELECT
Schedule Start Setup
For Weekday and Interval scheduling, the
the schedule to become active. Additional Starts can be added with a maximum of four starts per schedule. Once a start is activated, the
schedule will activate the rst valve (lowest number). Once it has completed its runtime, the second valve will water.
continue until all valves with runtimes have been activated. For LOOPING, see Step 3b below.
Step 1
– Press the
SCHEDULES button. Use the Up
press SELECT
.
Step 2
– Use the Up
or Down
Step 3a – Schedule Start Setup for Weekday and Interval Schedules. Skip to 3b for Looping Schedule.
Use the Left
or Right
Use the Up
or Down
Step 3b – Schedule Start Setup for Looping Schedule
When the Schedule Type is Looping,
be active. You will be setting the Start time and End time to de ne the window of looping operation.
Use the Left
or Right
Use the Up
or Down
Use the Left
or Right
Use the Up
or Down
Steps 4 and 5 do not apply to Looping Schedule.
Step 4
– Navigate to ADD START to add another start time (Weekday and Interval Schedules only). Press SELECT
new start time as indicated in Step 3.
Step 5
– To delete a start time, set the time to OFF.
hour of 12:00 AM/PM (23:00 and 00:00).
10
SCHEDULE A
WATERS EVERY
04 DAYS
CURRENT DAY
01
WATERS ON LAST DAY
OF INTERVAL
SCHEDULE A
WATERS EVERY DAY
to save the changes and return to the SCHEDULES menu.
®
EVOLUTION
AG
controller is set with 1 start time set to OFF. A start time must be set for
arrows to navigate to SCHEDULE STARTS. Press SELECT
arrows to navigate to the start time's Hours, Minutes and AM/PM.
arrows to set your desired start time. Press SELECT
e Schedule Start menu de nes the window of time in which the looping schedule will
arrows to navigate to the START TIME's Hours, Minutes and AM/PM.
arrows to set your desired start time. Press SELECT
arrows to navigate to the END TIMES's Hours, Minutes and AM/PM.
arrows to set your desired end time. Press SELECT
e OFF selection is located between the full hour of 11:00 AM/PM and the full
or Down
or Down
arrows to select the desired current day
e CURRENT DAY selection allows the user to
or Down
arrows to select the Schedule you want to set/edit and
arrows to select the desired
e schedule will
.
SCHEDULE
START
01:00AM
ADD START
EACH START RUNS ALL
to save.
SCHEDULED VALVES
SCHEDULE
START TIME
09:00AM
END TIME
04:00PM
to save.
to save.
. Modify the