Switch rotary switch to ACV position, Input terminals and test leads connecting as follows figure, then connect test leads to
circuit.
17
To avoid possible damage to the Meter or to the equipment under test, disconnect circuit power and discharge all high voltage
capacitors before testing for continuity.
Switch rotary switch to position, Input terminals and test leads connecting as follows figure, The continuity test features a
beeper that sounds as long as a circuit is complete. The beeper sounds when a short (<3Ω).
18