Maintenance Intervals; Order List - Dräger Panorama Nova Serie Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 11

Maintenance intervals

Type of work required
(Summary descriptions)
Check by the wearer of equipment
Visual inspection, performance and leak
test
Clean and disinfect
Replacing the exhalation valve disc
Replacing the speech diaphragm
1) Gastight packed full face masks every 2 years.
2) If the full face masks are hermetically packed. If not, every 6 months.

Order list

Designation and description
Panorama Nova S - EPDM - PC - RA
Mask goggles (spectacle frame and clamping device)
"klar-pilot" gel (antimisting agent for visor)
Sekusept cleaner
Incidur
Eltra
Carrier box Mabox I
Carrier box Mabox II
Carrier box Wikov V
Maximum intervals
X
1)
X
X
2)
X
X
X
X
Order No.
R 51 013
R 51 548
R 52 560
79 04 071
79 04 072
79 04 074
R 53 680
R 54 610
R 51 019
7

Publicidad

Tabla de contenido
loading

Tabla de contenido