6
Application and Operation
Before starting-up the furnace, it should
acclimate at the set-up location for 24
hours. Swift heating up in cold condition
can cause damage to the heating elements
(for example, burning-through).
During the first heating up, there may be
odour nuisance due to binding agent
fumes escaping from the insulation mate-
rial.
▷ Provide for thorough ventilation of the
furnace set-up location when heating up
for the first time.
WARNING:
Danger of fire and explosion!
The furnace surfaces become very warm.
▷ Do not place objects on the furnace!
NOTE:
Insufficient sintering results due to faulty tem-
perature control!
▷ Prior to every process, visibly check the ther-
moelement for damage.
DANGER:
Hot air at the outlet opening!
▷ Do not reach with your hand at or above the
outlet opening.
▷ Do not place objects on the furnace!
▷ Do not hang objects directly above the fur-
nace!
A P P L I C A T I O N A N D O P E R A T I O N
6.1
Selecting the sintering program
▷ To select a program: Press the
The list menu is indicated.
P1 ceramill standard
P2 ceramill fast
P3 ceramill slow
P
pqrs
Fig. 15 Display, list menu
▷ In the list, select the desired program with the
keys
-or-
▷ directly select the program by pressing the
key and the respective number key.
▷ To take over the program: Press the
The display switches to the operating level.
▷ To display the segments of the program: Press
the
key.
key.
1
2
3
abc
def
4
5
6
ghi
jkl
mno
7
8
9
tuv
wxyz
E N
0
+_-
key.
39