AC connection
8.3. AC connection process
1.
Insert the wiring through the cable inlets provided in the lower part of the charger.
2.
Connect the three phases, neutral and ground to the terminals marked R, S, T and N and to the
grounding bar PE.
The following table includes the tightening torques to be applied to the connection.
3.
Check the correct position of the cable grommet membrane and ensure the cabling is not taut.
ABT2012IQM01_ - Installation and Operation Manual
Tightening torques to apply
Connection
Terminals R, S, T, N
Grounding bar PE
PE
Tightening torque
5 Nm
10 Nm
Ingeteam
EN
ES
FR
IT
31