O p e r a t i o n
Se l e c t i n g t h e s p e e d r a n g e
Se t t i n g t h e s p e e d
CS Unitec, Inc. • Phone: 203-853-9522 • Toll-free: 800-700-5919 • Email: info@csunitec.com
2 2
CAUTION
►
Switch over the gear stages only with the machine at
standstill .
The machine has a gearbox with two mechanical gear stages:
Gear stage 1: Load speed 250 rpm
Gear stage 2: Load speed 450 rpm
To select the desired gear stage, set selector lever (5) to
stage 1 or 2 with the machine switched off .
NOTE
►
Select the speed range according to the material and drilling
diameter .
In addition to the mechanical gearbox, the machine also has
full-wave control electronics with which the speed can be infinitely
varied .
First set the appropriate gear stage, then adapt the speed
using the electronic speed control (7) .
Gear stage 1: 50 - 250 rpm
Gear stage 2: 100 - 450 rpm
NOTE
►
If possible, always select a setting with low gear stage and
high motor speed . The motor is thus set to high torque and
protected against overheating under heavy load .
www.csunitec.com
M A B 4 8 5