Belts (2)
NOTE: Use the belt recommended on page 9.
a) Install the belts (4) as illustrated aside.
b) Adjust the belt tightening according page 21.
c) Install the shield (5) and fasten it with four wing nuts
(2c).
Feeding nozzle (6)
Turn the feeding chute (6) according illustrated and
fasten with 3 bolts (6a), witch come along with extra
parts.
If you have difficulty in the assemble of the
feeding nozzle, remove the counter-knife
and set it with the feeding nozzle. (as per item
6.4).
4.2- Electric installation
(If you use electric motor)
The electric installation of the motor must be done by an
electrician.
The circuit braker (7) is supplied by JF and come along
with detached parts, if the machine is purchased with
electric motor.
14
2c
2c
5
7
ON button
OFF button
4
6
6a