Checks Before Commissioning - Grundfos Vaccuperm VGS-141 Instrucciones De Instalación Y Funcionamiento

Ocultar thumbs Ver también para Vaccuperm VGS-141:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 50
Measuring transducer (option)
Connect the terminals of the plug with the corresponding
terminals of an external evaluation device according to the
connection chart.
2
1
+
-
+
-
24 V DC
Fig. 24 Connection chart of measuring transducer
5.1.3 Measurement and Control Electronics Conex (option)
see operation manual of measuring amplifiers and controller
®
Conex
DIA-2Q or controller Conex
5.1.4 Chlorine measuring cell (option)
see operation manual of the chlorine measuring cell
5.1.5 Mounting the manual/automatic position remote
indication at the rate valve
This indication shows e.g. in the switch room, if the optional
servomotor is engaged and thus able to convert the incoming
signals.
Loosen the cover of the adjustment knob with a big
screwdriver; take off the adjustment knob.
Put the magnetic bridge sensor (item 5.6) into the lower cavity
of the gearbox bearing and fasten using the two recessed
head screws (item 5.7).
Disassemble the adjustment knob by fully screwing out the
clamping nut.
Insert the adjustment knob tongs into the washer disc (item
5.5) in a way that the tongs collar is in the washer disc.
Apply the washer disc to the adjustment knob enclosure so
that the holding pin of the enclosure dips into the hole of the
washer disc.
Slide the spring washer over the adjustment knob tongs and
screw the clamping nut onto the tongs.
Put the adjustment knob onto the gearbox spindle as far as it
will go and tighten the clamping nut.
Fit the cover of the adjustment knob again.
5.14
5.13
Fig. 25 Manual/automatic position indication
4-20 mA
®
DIS-2Q
5.1
5.12
5.7
5.6
5.5
5.1.6 Gas connections
Warning
Ensure that all container valves are closed before
connecting!
Only use the intended gas lines!
Connect line from vacuum regulator
Connect line to injector
from vacuum regulator
to injector
Fig. 26 Gas connections of gas dosing systen VGS

5.2 Checks before commissioning

Check tightness of the total plant before start-up
Warning
Check the tightness not until the total plant is ready
for start-up.
Danger of chlorine break-out!
5.2.1 Checking the gas solution lines and the diapgragm non-
return of the injector
Observe the manual of the injector!
5.2.2 Checking the tightness of the vacuum lines
Vacuum lines are all lines between vacuum regulator and injector.
Close all container valves
Close the rate valve
Open the shut-off valve at the injection unit
Open motive water valve
Switch on the booster pump
Open the rate valve
Floater shows gas flow or vacuummeter shows more than -
9 m w.c. => Leakage in vacuum line!
Close rate valve
Switch off booster pump
Close motive water valve
Close the shut-off valve at the injection unit
Check the vacuum lines and the connection. If necessary,
carefully re-tighten them.
Check tightness again!
– Floater shows no gas flow, vacuummeter shows -9 m w.c. or
less => Vacuum lines are tight.
More possible reasons for insufficient operating
vacuum
injector layed out too weakly or defective
Note
injector obstructed
booster pump layed out too weakly or defective
19

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Vaccuperm vgs-143Vaccuperm vgs-145

Tabla de contenido