Descargar Imprimir esta página

GUTMANN CLARO Instrucciones De Montaje página 28

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 66
EN
A + B - Version Outlet upwards
1. Implement measures for the installation
of the hood on site. Cover all kitchen appli-
ances, etc. In extraction mode: Prepare
suitable on-site exhaust air facilities in the
ceiling/wall on site.
2. Determine the installation direction of the
hood. If the LEDs are on the right hand side
from the user's perspective, the flap opens
in the user's direction.
3. Determine the position of the extractor
hood centrally over the hob (use a plumb
line for help) and mark the centre point of
the hood on the ceiling. Mark the fastening
holes from the hood body on the ceiling.
min.
I
B
28
ASSEMBLY INSTRUCTIONS
G
D
I
K
4. Drill four holes (Ø 10 mm) and insert the
wall plugs.
5. Screw the hanger bolts into the wall
plugs until approx. 20 mm protrude.

Publicidad

loading

Este manual también es adecuado para:

Em 0401Em 0411