►1.14. The cooler can withstand a maxi-
mum water inlet pressure of 3 Bar. If the
pressure of the water supply is higher, a
pressure reducer must be installed.
►1.15. Only fill the cooler tank only with
clean water.
►1.16. We recommend using horizontal
coverage to protect from weathering, in
order to preserve the cooler over time.
►1.17. It is forbidden to alter, tamper with
or adjust the cooler and the electricity or
water supply after installation, if it is not
carried out by qualified personnel.
►1.18. Do not obstruct, even partially, the
air vents of the cooler, in order to pre-
vent a hazard.
►1.19. In order to prevent serious dam-
age, do not let dust, dirt or other materi-
als come into contact with the cooler.
►1.20. We recommend using the cooler
with ambient temperatures between
18°C and 45°C and with water tempera-
ture below 45°C.
►1.21. In order to prevent serious break-
downs, when the temperatures drop to
about <2°C, completely empty the tank
and the pipes that supply water to the
cooler.
►1.22. Disconnect the power supply when
you handle or service the cooler (use
personal protective equipment in order
to prevent any hazards).
►1.23. If the power supply cable is dam-
aged, it must be replaced by a technical
support centre to prevent any risk.
►1.24. Protect the power cable from po-
tential damage caused by the movement
of vehicles, pedestrians, weathering and
heat sources.
►1.25. In the event of the cooler malfunc-
tions, disconnect the power supply and
contact the technical support centre.
►1.26. Unplug the cooler from the power
supply, when it is not used for a medium
to long term period.
►1.27. The water used to fill the cooler
tank must come from an aqueduct. If it is
not possible to draw from an aqueduct,
the water introduced must be subjected
to a sanitation treatment, according to
European Directive 98/82/EC.
-We recommend using water with a hard-
ness of less than 15°f.
-The cooler tank must be emptied and
sanitised periodically depending on the
use.
-The cooling pad surfaces must be pe-
riodically inspected and sanitised de-
pending on the use.
-For sanitation operations, biocidal prod-
ucts that comply with European regula-
tion no. 582/2012 must be used.
►►►2. UNPACKING
IMPORTANT: IT IS STRICTLY FORBIDDEN
TO STACK TWO OR MORE COOLERS.
►2.1. Remove all packaging material used to
pack and deliver the cooler and dispose of it
in compliance with current standards.
►2.2. Remove all items from the packaging.
►2.3. Check for any damage incurred during
transport. If the cooler appears damaged,
immediately inform the dealer from whom it
was purchased.
►►►3. ASSEMBLY AND INSTALLA-
TION (ONLY FOR QUALIFIED PER-
SONNEL)
NOTE: TO ACCESS THE INTERNAL PARTS
OF THE COOLER, REMOVE THE SCREWS
AND
EVAPORATION
THEM ON THE SIDES OF THE COOLER
(Pic. 2).
►►3.1. HANDLING
Handle the cooler with the utmost care, mov-
ing it horizontally.
►►3.2. PRE-INSTALLATION AND INSTAL-
LATION METHOD
(Pic. 3)
During installation, the electrical connection,
water connection, use and maintenance of
the cooler, comply with all local regulations
and standards in force.
►3.2.1. The cooler must be installed on a sta-
ble and level structure, so as to prevent any
PANELS,
PLACE
en
it
de
es
fr
nl
pt
da
fi
no
sv
pl
ru
cs
hu
sl
tr
hr
lt
lv
et
ro
sk
bg
uk
bs
el
zh