Test Adapter for Electric Vehicle Charging Stations

8-3-5.CP Error "E" Simulation

• With the CP Error "E" button CP Error can be simulated (acc. to standard IEC/EN 6185-1).
• When CP error "E" is pushed, a short circuit between CP and PE through internal diode is made.
• As a result, the pending charging process is aborted.

8-3-6.PE Error (Earth Fault) Simulation

• With the PE Error button an interruption of the PE conductor is simulated.
• As a result, the pending charging process is aborted.

8-3-7.Phase Indicator

• The phase indicator consists of three LED lamps, one for each phase.
• When the test adapter is connected to the charging station and phase voltages are present at the charging
connector, the LED indicators will illuminate.
Notes:
• In the case neutral(N) conductor is not present or it is interrupted, LED indicators will not indicate possible
voltage presence at L1, L2 and L3 conductors.
• The LED indicators cannot be used for phase sequence testing.
• If the charging station has only a single-phase output, only one LED will illuminate.

8-3-8.Mains Socket

• The mains socket is connected to L1,N and PE conductors of the charging station via the test adapter when it is
connected to the charging station.
• This output is intended for measuring purposes only and offers the possibility to check if the electric power meter
works and counts in the right manner (load test).
• Therefore, an external load can be connected for measuring purposes only, it is not allowed to supply anything
else.
• The max current is limited to 10A, the mains socket is protected against overload with 10A/250V,5x20mm fuse.

8-3-9.Measuring Terminals L1, L2, L3, N and PE

• Measuring terminals are directly connected to L1,L2,L3,N and PE conductors of the tested charging station via
the test cable.
• These terminals may be used for measuring purposes only, it is not allowed to draw current over a longer period
or supply anything else.
• An appropriate measurement instrument is needed.