g) Place the nailing head on its original position and using the 5mm Allen key and
tighten the locking screws 01 and 02 of the nailing head Fig. 41. Then place the
magazine on its original position fixed to the nailing head and tighten the
locking screws 03 and 04 of the magazine Fig. 42.
8.6 - How to change the nail pusher
For operator safety always disconnect the air source before cleaning, lubricating
of performing any maintenance.
In order to remove the nail pusher, follow these procedures:
! Tilt the working table;
! Disconnect the air hose source 01 Fig. 39 and loosen the two locking screws 02
Fig. 50;
! Now use a 6mm Allen key to remove the screws 02 Fig. 49 and the cylinder
support;
! Use a 6mm Allen key to loosen the four screws and remove the cylinder lid as
shown in Fig. 51/52;
! Then use a pair of pliers to remove the complete device for the nails pusher
cylinder as shown in Fig. 53;
! Once you have the nail pusher out and add a small amount of pneumatic oil
around the new rubber gasket;
! Carefully place the new one back inside the cylinder making sure the top edge
of the rubber gasket is inside the cylinder before pushing, if not, damage may
occur to the rubber gasket. Also, make sure the nail pusher is in the nailing
head as showing if Fig. 55;
! Once you have the complete nail pusher device into the cylinder, reassemble
the cylinder lid with the 6mm Allen key and tighten the four screws as shown
in Fig. 51. Also attach the cylinder support and tighten the screws 01 Fig. 49;
! Finally attach the air hose to the cylinder and with the nails out make few
tests before you start production.
INMES INDUSTRIAL LTDA - GRAMPEADORA IM-4P – UNDERPINNER IM-4P
ENSAMBLADORA IM-4P
Fig. 47
Fig. 48
48