Installation; Installation - Ductless (Recirculating) Version - ELICA Ecolution Platinum-Ola-Wave Guía De Instalación, Uso Y Mantenimiento

Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation

Installation - Ductless (Recirculating) version

Installation ceiling model (Island)
1. Pre-installation calculations
C = Counter Height (36" standard)
H = Prefered Height of Hood
Bottom above counter
L = Chimney Structure Height, your installation.
L = X-Y-H+1" 3/16
a) Select a hood preference height H that is comfortable for
the user.
b) Calculate Hood height your installation L = X-Y-H+1"
3/16 .
c) Confirm that H is within the range of min to max H found
for your model (See "Dimensions and clearances"
paragraph). If not adjust your installation.
2. Preparation of mounting surface
Installing supports above ceiling drywall.
Note: Take into consideration the hood depth; the hood
could be much deeper than the cooktop.
a. Mark center lines of cooktop or range on ceiling above.
Use centerlines marked on ceiling to position the
mounting template.
Note location of hood front (that indicated with a printed
arrow), side, and mounting holes indicated on template.
Note: Remember that printed arrow on template
corresponds to front of the hood and consequently to
side where control panels will be located at the end of
installation)
b. Remove and save template. Cut and remove ceiling
drywall. Install suitable length 2" x 4" lumber between
joists to provide support bracket mounting points as
shown above. Use template for dimensions and
required clearance.
Make sure to affix the added lumber firmly and level.
Consult a professional if you have difficulties or your
8

Publicidad

Tabla de contenido
loading

Tabla de contenido