Indoor Unit Installation; Select Installation Location - EAS ELECTRIC R32 Manual De Usuario

Ocultar thumbs Ver también para R32:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Indoor Unit Installation

Installation Instructions – Indoor unit
NOTE: Panel installation should be performed after piping and wiring have been completed.
Step 1: Select installation location
Before installing the indoor unit, you must
choose an appropriate location. The following
are standards that will help you choose an
appropriate location for the unit.
Proper installation locations meet the
following standards:
Enough room exists for installation and
maintenance.
Enough room exists for the connecting the
pipe and drainpipe.
The ceiling is horizontal and its structure can
sustain the weight of the indoor unit.
The air inlet and outlet are not blocked.
The airflow can fill the entire room.
There is no direct radiation from heaters.
Recommended distances between the indoor unit
The distance between the mounted indoor unit should meet the speci cations illlustrated in the
following diagram.
100mm
≥100mm
700mm
100mm
DO NOT
install unit in the following
locations:
Areas with oil drilling or fracking
Coastal areas with high salt content in the
air
Areas with caustic gases in the air, such as
hot springs
Areas that experience power uctuations,
such as factories
Enclosed spaces, such as cabinets
Kitchens that use natural gas
Areas with strong electromagnetic waves
Areas that store flammable materials or gas
Rooms with high humidity, such as
bathrooms or laundry rooms
210mm
≥1000mm
Page 21
V.2

Hide quick links:

Publicidad

Capítulos

Tabla de contenido
loading

Este manual también es adecuado para:

R290

Tabla de contenido