Diagrams, Motor Overload, Switch Settings - ITT Goulds Pumps AquaBoost II 1AB2 Instalación, Operación Y Mantenimiento

Control de bomba de velocidad variable
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Diagrams
Section 8
Section 8
Motor Overload and Application Switch Setting
Example: For 30 Hz
minimum speed and
medium ramp setting,
set application switch
setting as indicated.
Danger
When the unit is powered, the Motor Overload and Application Setting Switches are at a
DANGER
high voltage potential. Always turn off the disconnect switch and circuit breaker and wait
Hazardous
voltage
5 minutes before touching the Motor Overload or Application Setting Switches.
Diagram 3
AquaBoost II Wiring Diagram
Input
230V
1 Phase
Line input power from
2-pole disconnect or
circuit breaker.
Diagram 4
See Manual For
Switch Settings
Output
Motor
To Motor
Applic.
Overload
Type
Setting
1 2 3 4
1 2 3 4
11
Example: If motor
nameplate service
factor amps = 3.3 A for
1AB2 or 5.3A for 2AB2,
set motor overload
switches as indicated.
Pressure
Sensor
Line output to motor.
Correct motor rotation
determines order of colors.
Pressure
Sensor
7K2100

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Goulds pumps aquaboost ii 2ab2

Tabla de contenido