ENGLISH
Setup procedure has now been completed.
• Set switches S4, S5 and S6 all to OFF position.
4 5 6
• Install cable ends to throttle and gearbox lever.
• Re-install rubber plug and install cover on actuator unit.
• Test the functioning of the system, consult the owner's manual
how to do.
Preliminary
31
vetus® Installation Manual V-docker
020702.01