Sequence Description - Festo MPS Manual Del Usuario

Ocultar thumbs Ver también para MPS:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

10 Sequence description

Start-up prerequisites
No workpiece on the conveyor
Magazine filled with boxes
Initial position
Conveyor module
— Conveyor motor off
— Stopper advanced
2-axis handling module
— Z-axis at top
— Mid-position cylinder retracted
— Gripper closed
— X-axis homed and in initial position
Packaging module
— Clamping cylinder advanced
— Feed cylinder retracted
— Setup cylinder retracted
— Folding mechanism in initial position
— Stop cylinder retracted
Sequence
1. When the start key is pressed and a workpiece is placed onto the beginning of the conveyor, the
conveyor belt is started in order to advance the workpiece to the stopper.
2. After the workpiece has reached the stopper, a box is prepared for loading.
3. When the box is ready, the workpiece is gripped by the 2-axis handling module and transported to the
packaging module.
4. After the box has been loaded, it's closed and returned to the conveyor module.
5. The conveyor module transports the box to the end of the conveyor belt or to a downstream station.
© Festo Didactic 8062973
Packaging station
63

Hide quick links:

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

8062973

Tabla de contenido