Installation Check-Up; Hot Water - Faema E71 E Instrucciones De Uso E Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 147

5. Installation Check-up

WaRnInG: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY
(see the Installation Module C)
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-levelling device is working properly.
The expansion valves are working properly
WaRnInG: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE
ALLOWING THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS
ACCORDING TO THE INSTRUCTIONS BELOW:
GRoUpS
Hook up the filter holders to the groups (without coffee).
Let each group dispense water for about a minute.

hoT WaTER

Continuously dispense hot water (pressing the appropriate button) until at least 2,5 liters of water have been used.
See the "Hot water dispensing" chapter in the User's Manual.
STEaM
Dispense steam from the nozzles for about a minute, using the appropriate buttons.
.
7 EN

Publicidad

Tabla de contenido
loading

Tabla de contenido