Installation Check-Up; Hot Water - La Cimbali M39 Dosatron TE Manual De Uso E Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 125
WARNING: AFTER INSTALLATION, CHECK TO SEE IF THE MACHINE IS WORKING PROPERLY (see the
Installation Module C).
WATER CONNECTIONS
No leaks from the connections or tubes
FUNCTIONING
Boiler and operating pressures are normal.
The pressure gauge is working properly.
The self-leveling device is working properly.
The expansion valves are working properly
WARNING: ONCE THE MACHINE HAS BEEN INSTALLED AND IS READY FOR USE, BEFORE ALLOWING
THE WORKER TO START USING THE MACHINE, WASH THE INTERNAL COMPONENTS ACCORDING
TO THE INSTRUCTIONS BELOW:
GROUPS
Let each group dispense water for about a minute.

HOT WATER

Continuously dispense hot water (pressing the appropriate button) until at least 5 liters of water have been used
for a machine with 2 groups, 8 liters for a machine with 3 groups and 10 liters for a machine with 4 groups (see the
"Cleaning and Maintenance" Chapter in the User's Manual).
STEAM (also with Turbosteam)
Dispense steam from the nozzles for about a minute, using the appropriate buttons.

5. Installation Check-up

5 EN

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido