Use; Day-To-Day Operation; Manual Powering - La Cimbali M39 Dosatron TE Manual De Uso E Instalación

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 125
"Before setting the machine at work, make
sure that:
- the main electric power switch is on;
- the mains water cock has been turned on".

MANUAL POWERING

Press the luminous main switch (1) to turn on the machine.
The the key LEDs light up and the following message will
appear on the display (16):
21
September
wednesday
If the water level in the boiler is lower than the minimum
this phase, the
icon will appear in the lower left hand
corner of the display.
The preset working pressure must be reached before the
machine is ready for use.
If any dispensing key is pressed during this phase, the
following message will appear on the display:
21
September
wednesday
MACHINE COLD
PLEASE WAIT
The machine is ready to work when the display (16) indicates
the working pressure:
21
September
wednesday

USE

10. Day-to-day operation

2011
15:15:04
2011
15:15:04
2011
15:18:12
9 EN
ON
1
16
C

Hide quick links:

Publicidad

Tabla de contenido
loading

Tabla de contenido