Compressor Operation; Compressor Operation Checklist; Cylinder Prefill Inspection - Invacare IRC5LXO2 Manual De Instrucciones

Ocultar thumbs Ver también para IRC5LXO2:
Tabla de contenido

Publicidad

COMPRESSOR OPERATION

This Procedure includes the following:

Compressor Operation Checklist

Cylinder Prefill Inspection

Connecting the Cylinder to the Compressor
Turning the Compressor On
Removing the Cylinder
Setting the Flow Knob to the Prescribed Setting
COMPRESSOR OPERATION CHECKLIST
Each time the HomeFill II Compressor is used to fill a cylinder,
complete the following checklist:
NOTE: All steps mentioned below are in this procedure, unless otherwise noted.
Ensure the concentrator has been on for at least thirty (30)
minutes. Refer to the concentrator owner’s manual, Part One.
Perform the prefill inspection on the cylinder.
Connect the cylinder to the compressor.
Turn the compressor on.
Examine the indicator lights on the control panel.
Remove the full cylinder.
Turn the compressor off.
If filling another cylinder, repeat this checklist.
CYLINDER PREFILL INSPECTION
(FIGURE 1)
ONLY use cylinders that have the Invacare Venture
HomeFill II connection and the label shown in FIGURE 1.
All cylinders must be inspected before attempting to
fill: otherwise, injury or damage may occur.
WARNING
11
PROCEDURE 3
PART TWO

Publicidad

Capítulos

Tabla de contenido

Solución de problemas

loading

Este manual también es adecuado para:

Irc5lx

Tabla de contenido