Power Supply; Loading Plc Programs; Starting The Sequence - Festo MPS 8049013 Manual Del Usuario

Estación de almacenamiento
Ocultar thumbs Ver también para MPS 8049013:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

10.4 Power supply

The stations are supplied with electrical power from a power supply unit with an output voltage of
24 V DC (max. 5 A).
The entire station is supplied with electrical power from the rack PLC.

10.5 Loading PLC programs

Proceed as described in the user's manuals for the utilized programming software in order to load the PLC
programs.
Current PLC programs for various controllers can be found on the Internet at the following website:
www.festo-didactic.com > Services > MPS® The Modular Production System > Stations

10.6 Starting the sequence

1. Check power supply and compressed air supply.
2. Before aligning, manually remove workpieces from modules and station transfer points.
3. Conduct the alignment procedure. The alignment procedure is prompted by the blinking ALIGN key and
is conducted after the key has been pressed.
4. Place a workpiece onto the beginning of the conveyor.
5. Start the separating station's sequence. Start-up is prompted by the illuminated START key and is
executed after the key has been pressed.
Notes
The sequence can be stopped at any time by pressing the emergency stop button or the
STOP key
You can select either continuous cycling (AUTO) or a single cycle (MAN) with the help of the
AUTO/MAN key switch.
The following applies when several stations are combined:
The individual stations are aligned in the order opposite the direction of material flow.
© Festo Didactic 8049748
Storage station
51

Publicidad

Tabla de contenido
loading

Tabla de contenido