Descargar Imprimir esta página

Playcore Swing-N-Slide NE 5010 Instrucciones De Montaje página 74

Publicidad

PROJECT 513
Fig.12
Fig.12a
Fig.12b
(16)
2-1/2'' screws
2-1/2'' screw
M. Install Upper Rail Boards
1. Install under deck support as shown in (Fig 12).
Flush with the edges of 5/4'' x 6'' deck supports.
2. Hold Deck Support Board from below until secured in
place from above as shown in (Fig. 12a) and
(Fig. 12b).
26

Publicidad

loading

Este manual también es adecuado para:

Swing-n-slide project 512