Bottom Beam Clamp
(4) 1-1/4'' screws
Q. Swing Beam Drill Locations
1. Tap t-nut into 3/8'' hole as shown in (Fig. 19)
2. Place a bottom beam clamp over the swing hanger as shown in (Fig. 19)
3. Insert the swing hanger into the beam and thread it into the T-nut until it is flush or near flush with the top of the
T-nut. A screwdriver may be used to twist the hanger (Fig. 19). Orient swing hanger as shown in (Fig 19).
4. Use (4) 1-1/4'' screws to secure beam clamp.
5. Check hanger to ensure it does not spin.
6. Repeat for both swing hangers.
T-nut
t-nut
Swing Hanger
31
Hammer
3/8'' hole
Use Screwdriver to aid in tightening
PROJECT 513
Fig. 19