FAAC S418 Manual De Instrucciones página 12

Ocultar thumbs Ver también para S418:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 31
2. TECHNICAL SPECIFICATIONS
Technical specifications
Power supply (Vdc)
Nominal power (W)
Absorbed current (A)
Maximum thrust force (daN)
Stroke (mm)
Speed (cm/sec)
Maximum size of leaf (m)
Type and frequency of use at 20°C
Consecutive cycles at 20°C
Operating ambient temperature (°C)
Operator weight (KG)
Protection class
Operator dimensions
If you should not wish to use the mechanical stops on opening
a
and closing, the operator stroke becomes 390 mm.
With leaves of over 2.3 m, an electric lock must be installed to
b
ensure locking of the leaf.
3. INSTALLATION
3.1. ELECTRICAL PREPARATIONS (standard system)
Part
Description
1
Operators
2
Control unit
3
TX photocells
RX photocells
4
5
Key selector
6
Flashing lamp
7
External antenna
8
Mechanical stops
To lay the electrical cables, use adequate rigid and/or
flexible tubes.
To avoid any type of interference, we advise you to always
separate the low-voltage accessories and command
connection cables from the power supply cables, using
separate sheaths.
3.2. PRELIMINARY CHECKS
For correct operation of the automated system, the structure of
the existing gate, or that to be fitted, must have the following
requisites:
• The mechanical construction parts must conform to the provisions
of Standards EN 12604 and EN 12605.
• The length of leaf must conform to what is shown in the technical
characteristics of the operator (paragraph 2).
• The structure of the leaves must be sturdy and rigid, suitable for
an automated system.
• There must be regular and uniform movement of the leaves, with
no rubbing or sticking along their entire movement.
• Hinges must be suitably sturdy and in good condition
S418
• Mechanical opening and closing stop-points must be present
on the ground (not necessary if mechanical operator stops are
24
used).
35
1.5
180
350
a
1.8
3.3. INSTALLATION VALUES
2.7
b
Determine the assembly position of the operator, referring to
80 cycles/day
figure 4 and related table. It is a good idea at this stage to choose
30
whether you want to use the mechanical operator stops or not; this
is because eliminating the mechanical stops increases the working
-20 +55
stroke of the operator and values A and B must be changed.
6
IP54
See fig. 2
With mechanical
With mechanical
Fig. 3
Cables
Supplied
3x1.5 mm
2
Working stroke of the operator.
a
(power supply)
Maximum value.
b
4x0.5 mm
2
Minimum value.
c
(2x0.5 mm
Bus)
2
Depending on the geometry of the gate is necessary to increase
d
2x0.5 mm
the share and a maximum of 115 mm using appropriate thickness
2
to be interposed between the bracket and leaf.
2x0.5 mm
(1 contact)
2
3x0.5 mm
(2 contacts)
2
2x1.5 mm
2
Coaxial cable
10
It is recommended that any metalwork operations should
be performed prior to installing the automated system.
The structure of the gate directly influences the reliability and
safety of the automated system.
a
A
165
165
90°
175
175
stops
110° 150
150
175
165
90°
stop
180
180
at opening
110° 160
160
90°
180
180
With no stops
110° 170
170
Once the operator has been installed, check that the value of
"X" in figure 5 is greater than 500 mm. If the value of "X" is less
than 500 mm, an impact test must be performed as described
by standard UNI EN 12445, checking that the values found
comply with what is established by standard UNI EN 12453.
If the values found should not correspond to what is
established by the standard, the area MUST be protected
with a protecting device complying with standard
UNI EN 12978.
Fig. 4
B
C
D
Z
L
E
a
b
c
330
90
75
690
105
350
90
85
690 105
340
80
70
690
105
340
100
75
708
105
360
100
80
708 105
360
90
70
708
105
360
110
70
708 105
380
100
70
708
105
c
d
d
d

Publicidad

Capítulos

Tabla de contenido
loading

Tabla de contenido