Electrical Connections; Installing The Control Panel - Palazzetti MUTIFIRE IDRO NT Serie Uso Y Funciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

5.7 LEVELLING THE FURNACE AND
INSERTING THE MAGNOFIX TOP
PANELS
The stove is equipped with wheels that facilitate its
positioning. Once settled in its final position it must
be levelled, with the aid of a spirit level, adjusting
the feet (fig. 5.6) and ensuring that the wheels are
raised above the ground.
Proceed at the same time with the regulation of the
frame that supports the side tank.
For correct positioning, check that the front marble
cover profile is at a height such as to be in contact
with any marble surface of the casing.
Open the furnace door and correctly insert the two
magnofix top panels (Fig. 5.6a).

5.8 ELECTRICAL CONNECTIONS

In order to function, the stove needs an electrical
power supply.
`
It is sufficient to connect the product to the electrical
system using the plug provided.
The electrical connection (plug) must be easily
accessible after installation of the stove.
If the power cable is damaged it must be replaced
by the technical support service or by a qualified
technician so as to prevent any risk.
5.8.1 Earthing
It is mandatory that the system is earthed
and equipped with a residual-current device in
compliance with the regulations in force.

5.8.2 Installing the control panel

The stove's control panel can be mounted into a
plasterboard wall by cutting a hole (105x60mm) and
fitting its mounting bracket (included) to its back with
the two bolts (fig. 5.7).
Do not install the panel in a hot area of the hood.
Run the cable between the panel and the stove in
such a way that it is not damaged by heat when
the stove is running stove is running and does not
interfere with the electro-mechanical components.
The control panel hooks up with its cable (included)
to connector RJ11 on the electronic panel (fig.
5.8).
5.8.3 Connection to the connection box
The connection box allows communication with the
stove through its own mobile device, downloading
the appropriate App.
Connect the connection box to the RJ11 connector
on the electronic panel (fig. 5.8).
Follow the instructions contained in the package
for the installation of the device.
30
00 477 6120 - 20/03/2019
fig. 5.6
fig. 5.6a
fig. 5.7
fig. 5.8

Publicidad

Tabla de contenido
loading

Tabla de contenido