3.3 Preparation for use
•
When unpacked, the tester should be inspected for any visible signs of
damage. The test leads should be inspected for cracks, continuity or
damages. Do not proceed with damaged leads. Press the ON button and
make sure the batteries are in good condition (low battery will be indicated on
the display and BAT OK led will not lif if batteries need to be replaced).
BEFORE INITIATING A TEST THE FOLLOWING POINTS MUST BE
•
All the Residual Current Devices (RCD) must be bypassed during the
duration of the test.
ATTENTION:
ATENCIÓN:
•
In order to avoid wrong measurements and posible failures, it is necessary
to disconnect all the load equipment from the installation.
•
Draw a quick scheme about the installation in order to verify that obtained
results correspond to the actual installation.
Page 10
VERIFIED:
By safety, make sure that there is no personnel without
authorisation using the installation.
Once the test is completed, afresh reconnect the RCDs to avoid
leaving the installation without electrical protection.
USER'S MANUAL. PE-425
05/2015