Description Of Symbols; Preparing The Machine For Operation; Installing The Wheels And Feet; Assembling Machine Ge 135 L - Viking GE 135 L Manual De Instrucciones

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

  • MEXICANO, página 25

6. Description of symbols

Caution!
Read the instruction man-
ual before initial use.
Risk of injury!
Keep other persons out of
the danger area.
Risk of injury!
Rotating tools.
Keep hands and feet away
from apertures when
machine is running.
Risk of injury!
Switch off the motor and dis-
connect the power cable
from the machine before
working on the cutting tool,
before performing mainte-
nance and cleaning work,
before checking whether the
electric cable is entwined or
damaged and before leaving
the machine unattended.
14
Wear hearing protection.
Wear safety glasses.
Wear work gloves.
Rotational direction for

adjusting the counterplate.

Shredder box locked in
place
Shredder box unlocked
7. Preparing the machine for
operation

7.1 Installing the wheels and feet

GE 140 L:
– Fold out the machine. (
Installing the wheels:
GE 135 L, GE 140 L:
– Remove the shredder box. (
● Lever wheel cap (1) from wheel (I)
using a screwdriver.
● Insert bolt (J) with washer (L) from the
inside through the bore in wheel
carrier (B). Push washer (L) and
sleeve (K) onto bolt (J). Push wheel (I)
onto sleeve (K). Fit nut (M) with
washer (L) and tighten to 5-7 Nm.
● Centre wheel cap (1) on wheel (I) and
press in until wheel cap (1) engages.
– Repeat this procedure on the other
side.
Installing the feet:
● Insert the bolt of foot (F) through the
bore in wheel carrier (B) from below. Fit
washer (G) on the bolt, screw on
nut (H) and tighten to 4-6 Nm.
– Repeat this procedure on the other
side.
7.2 Assembling machine
GE 135 L
● Remove the shredder bag.
(
10.6)
● Position upper machine (A) on wheel
carrier (B) and carefully centre. Make
sure that rubber cover (1) is positioned
correctly – rubber cover (1) must not be
clamped between the upper machine
and the black cover on the wheel
carrier. Install upper machine (A) on
wheel carrier (B) by screwing in four
3
screws (D). Tighten screws (D) to 1-
1,5 Nm.
10.12)
● Insert the shredder bag. (
10.6)
4
10.5)
0478 201 9811 B - EN

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Ge 140 l

Tabla de contenido