V
Fig. 7
X
Fig. 8
INSTALLATION
V1
W
Y
Fig 7
• Remove the ash-tray hooking mechanism (V) before remo-
ving the front lever (V1).
Fig 8
• Detach the pellet hopper structure (Z) from the boiler block
(X) by removing the two screws (Y) positioned at the base of
the structure and the four screws (W) positioned on the hydrau-
lic kit..
view of the
hydraulic
kit from
the rear
Z
W
Y
- 64
-
W