Requirements On The Installation Site; Electrical Connection; Appliance Description - UNITED OFFICE ULGD 350 A1 Instrucciones De Uso

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Requirements on the installation site

GB
MT

Electrical connection

Appliance description

Pouch ejector slot
Indicator light Ready (ready for use)
2
3
Indicator light Power (appliance switched on)
Anti-Blocking switch and pouch thickness switch
4
On/Off switch with selector switch for hot and cold lamination (Hot/Off /Cold)
5
Pouch slot for manual pouch insertion
6
Document support
48
For safe and fl awless operation of the appliance, the installation site must comply
with the following requirements:
When setting it up, place the appliance on a fi rm, fl at and horizontal surface.
Place the appliance so that at least 30 cm of space remains unoccupied
behind the laminator. Otherwise the laminating pouch cannot be completely
ejected from the laminator after lamination.
Do not operate the appliance in a hot, wet or very humid environment or
close to combustible material.
The mains power socket must be easily accessible, so that the power cable
can be easily disconnected in the event of an emergency.
IMPORTANT
Before you connect the appliance, compare the connection data (voltage
and frequency) on the data plate with that of your mains power network.
This data must match in order to avoid any damage to the appliance.
Ensure that the power cable is undamaged and is not routed over hot
surfaces and/or sharp edges.
Ensure that the power cable is not taut or kinked.
Do not let the power cable hang over edges (trip wire eff ect).
Insert the plug into a mains power socket.
ULGD 350 A1

Publicidad

Tabla de contenido
loading

Tabla de contenido