Grid Connection Menú; Non Critical Loads Menú - ECOFOREST ecoSMART e-system Manual Instalador

Ocultar thumbs Ver también para ecoSMART e-system:
Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

5.10. GRID CONNECTION menu
1425
ta mu
2/6
Sytm
a.Chag aguag
a.Hat pump mo
b.Sytm
b.G cocto
c.Svc
c.Pow maumt
2/5
G cocto
Typ
5.11. NON CRITICAL LOADS menu
1425
ta mu
2/6
Sytm
a.Chag aguag
c.Pow maumt
b.Sytm
.No-ctca oa
c.Svc
.Commucato
4/5
oa cofg.
t btw cocto
0m
t btw hutow
0m
oa 4
Coct?
Coumpto
ctvato fom
t to actvato
ow coct?
Dcoct fo
0m
oa 1
Coct?
Coumpto
ctvato fom
t to actvato
ow coct?
t to coct
2/5
Grid connection
Allows us to select the type of electrical installation between SINGLE
1PH
(1PH) or THREE PHASE (3PH).
4/5
Loads configuration
Allows the selection of the waiting time for the activation and
deactivation between two consecutive non-critical loads.
Load x
1.0kW
100%
These screens allow us to enable each of the 4 non-critical loads
10
Y
individually. For each load we select his maximum consumption value,
50%
the percentage of energy surplus of this load and time above this value
to switch the load. The loads are connected by priority in ascending
order (1-2-3-4).
*Ex: If we set a maximum consumption load of 1kW, the activation for 50% and the time
for activation of 10s, it means that when there is a surplus of energy of 0.5kW during a
period of 10s, the load will activate.
By default the disconnection is done when a configurable percentage
of the load power is taken from the grid (Allow disconnect?: Yes) in the
1.0kW
100%
10
same way as the connection. In this case, the disconnection is done by
No
priority in descending order (4-3-2-1)
5m
It is also possible to program the disconnection through a configurable
timer (Allow disconnect?: No), or by digital input or keyboard disabling.
*To enable each load, it is necessary that they are also enabled under the user menu in
the load control submenu. In this screen we can also disable active loads via keyboard.
77
Installer manual ecoSMART e-system

Publicidad

Tabla de contenido
loading

Tabla de contenido