5.10. GRID CONNECTION menu
1425
ta mu
2/6
Sytm
a.Chag aguag
a.Hat pump mo
b.Sytm
b.G cocto
c.Svc
c.Pow maumt
2/5
G cocto
Typ
5.11. NON CRITICAL LOADS menu
1425
ta mu
2/6
Sytm
a.Chag aguag
c.Pow maumt
b.Sytm
.No-ctca oa
c.Svc
.Commucato
4/5
oa cofg.
t btw cocto
0m
t btw hutow
0m
oa 4
Coct?
Coumpto
ctvato fom
t to actvato
ow coct?
Dcoct fo
0m
oa 1
Coct?
Coumpto
ctvato fom
t to actvato
ow coct?
t to coct
2/5
Grid connection
Allows us to select the type of electrical installation between SINGLE
1PH
(1PH) or THREE PHASE (3PH).
4/5
Loads configuration
Allows the selection of the waiting time for the activation and
deactivation between two consecutive non-critical loads.
Load x
1.0kW
100%
These screens allow us to enable each of the 4 non-critical loads
10
Y
individually. For each load we select his maximum consumption value,
50%
the percentage of energy surplus of this load and time above this value
to switch the load. The loads are connected by priority in ascending
order (1-2-3-4).
*Ex: If we set a maximum consumption load of 1kW, the activation for 50% and the time
for activation of 10s, it means that when there is a surplus of energy of 0.5kW during a
period of 10s, the load will activate.
By default the disconnection is done when a configurable percentage
of the load power is taken from the grid (Allow disconnect?: Yes) in the
1.0kW
100%
10
same way as the connection. In this case, the disconnection is done by
No
priority in descending order (4-3-2-1)
5m
It is also possible to program the disconnection through a configurable
timer (Allow disconnect?: No), or by digital input or keyboard disabling.
*To enable each load, it is necessary that they are also enabled under the user menu in
the load control submenu. In this screen we can also disable active loads via keyboard.
77
Installer manual ecoSMART e-system