Before operation
Before operation / Initial operation
•
Delivery, or instructions on safety regulations, handling and maintenance, in addition to initial commissioning, are normally undertaken
by an approved expert. If this is not the case, the operating company is responsible for instructing the operator.
•
Items of jewellery, such as rings and chains, must be removed.
Before operation:
1
Charge batteries (approx. 5-6 hrs)
3
Main switch must be ON
LED indicator while charging:
Fully charged
Loading almost completed (approx. 20 min.)
LED indicator while in use:
Fully charged
Remaining battery capacity at approx. 30%
Is illuminated
Flashes
43
2
LED indicator is on
4
The battery is fully
charged, when the green
light is on.
Battery is loading
Battery is defective
Battery almost low, recharge immediately
Battery low, machine is switched off.
Machine is locked until a minimum
recharge of battery of 20 min. has
been completed.