Kohler K-306 Guia De Instalacion página 9

Ocultar thumbs Ver también para K-306:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Cold Supply 1"
Copper Tube
This feature faces downward
for back-to-back installation.
5. Back-to-Back Valve Installation
Install both valves following the valve installation instructions.
The supplies to one of the valves will be reversed.
Remove the plaster guard, cap, cap assembly, and collar from the
valve with the reversed supply connections.
Rotate the cap assembly and collar 180° (tab on the bottom).
Reassemble and securely tighten the screws.
Reinstall the plaster guard.
Kohler Co.
Hot Supply 1"
Copper Tube
180˚
Cap
Assembly
9
Plaster Guard
Screws
1012679-2-C

Publicidad

Tabla de contenido
loading

Tabla de contenido