Complete The Installation - Kohler K-306 Guia De Instalacion

Ocultar thumbs Ver también para K-306:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Pressure-
Balancing Unit
Valve
Stop
Screw
Stop
Cover
Valve Assembly

7. Complete the Installation

If you remove and reinstall the pressure balancing unit (PBU),
inspect the two inlet seals. If they are damaged, replace them
with the provided extra inlet seals. Lubricate the seals using the
capsule provided.
To reinstall the PBU, push it into the valve in the initial install
position shown. Make sure the PBU seals do not come in contact
with the inlet/outlet holes during initial installation because their
rough edges may damage the seals.
Rotate the PBU counterclockwise while applying downward
pressure until it is seated in the seating indents on the bottom of
the valve. There will be a noticeable click sound when the PBU
properly seats. The PBU should not rotate when it is properly
seated.
Kohler Co.
Valve Cap
Screw
Final Install
Position
11
Initial Install
Position
Valve
PBU Installation
Water
Outlet Hole
PBU
1012679-2-C

Publicidad

Tabla de contenido
loading

Tabla de contenido