BRS-FP
6 Putting into operation
Risk of injury due to unexpected start-up
The following instructions must be adhered to throughout all maintenance, servicing, assembly,
disassembly and repair work:
• Switch off the power source.
• Close the compressed air supply.
• Close the gas supply.
NOTICE
• Please take note of the following instructions:
2 Safety on page EN-4
• The system may only be installed and put into operation by qualified personnel (in Germany see
• Make sure that the cleaning process is not impaired by the collecting tray and the bottle holder.
1
PCB
2
Compressed air line for motor
3
Silencer
Fig. 4
Putting into operation
DANGER
TRBS 1203).
7
6
4
Pneumatic connection
5
Electrical connection
6 Putting into operation
1
2
3
4
5
6
Support (optional)
7
Covering hood
EN - 11