Optional Heater Jacket Junction Box; Led Light; Retrofit Heater Jacket (S19-881Hr) Installation Instructions - Bradley On-Site S19-881 Instrucciones De Instalación

Lavador de ojos de alimentación por gravedad
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Installation Instructions

Optional Heater Jacket Junction Box

LED Light

Green Light: an indication that the unit has power.
Amber Light: an indication that the heater is in operation and heating the unit. The light will be on
only while the heater is operating (heating the unit).
Red Light: an indication that the thermostat needs to be reset. To reset the thermostat, follow the
procedure outlined below.
a. Remove the top of the heater jacket.
b. Find the "reset" button on the thermostat (located on the tank) and press the button.
• After pressing the button, check to be sure that the red light is off and that the green light
is on (the amber light will be on only if the heater is operating). If the red light is still on,
press the "reset" button again.
c. Replace the top of the heater jacket.
Retrofit Heater Jacket Installation Instructions (S19-881HR)
1. Remove the backing from the heater pad and place it onto the pedestal as shown in Figure 5.
2. Continue with the heater jacket installation instructions on page 4.
Bradley Corporation • 215-1271 Rev. H; EN 03-554
POSITION HEATER PAD
EVENLY AROUND DRAIN HOLE.
DO NOT BLOCK DRAIN HOLE.
TOP VIEW OF PEDESTAL
Figure 5
®
On-Site
Gravity-Fed Eye Wash
9/11/03
S19-881
7

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

On-site s19-881hOn-site s19-881hr

Tabla de contenido