Installation
Connecting the boiler
Mounting the syphon and the dirt
collector
Mount the pre-assembled dirt collector
and shyphon (included in the package)
before first ignition or when the boiler
is completely shut-off and follow the
instruction below:
•
Remove the cap A from the syphon
and the gasket C.
•
Connect the hose (E) to the syphon
as explained in the picture on the
right, turning anti-clockwise the cap
(B).
•
Connect the input (H) of the dirt
collector to the pipe (L).
•
Warning!
Syphon and dirt collector, must
be completely filled with water.
Make sure there is no residual air
inside, before connect them to
the boiler.
•
Connect the pipe (L) to the bottom
of the condensate receptacle (M).
•
The connection to the draining
system should always be done
with an open connection, in order
to avoid a flooding of the boiler in
case of a blocked drain.
•
Perform an inspection and cleaning
regularly
WARNING - SAFETY INSTRUCTION
Do not remove or re-position the
metal ring (N) in the dirt collector .
WARNING: Do not remove the metal
ring for any reason.
If the ball of syphone (N) is in the dirt
collector (7) shut off the boiler and
call an authorized technical center.
N
OK
WARNING
NOT OK
EN -
Operation and Installation manual
A
C
H
L
N
D
C
B
E
M
M
7
8
7
27