Rendamax R3 EVO Serie Manual De Uso E Instalación página 27

Tabla de contenido

Publicidad

Idiomas disponibles
  • MX

Idiomas disponibles

Installation
Connecting the boiler
Mounting the syphon and the dirt
collector
Mount the pre-assembled dirt collector
and shyphon (included in the package)
before first ignition or when the boiler
is completely shut-off and follow the
instruction below:
Remove the cap A from the syphon
and the gasket C.
Connect the hose (E) to the syphon
as explained in the picture on the
right, turning anti-clockwise the cap
(B).
Connect the input (H) of the dirt
collector to the pipe (L).
Warning!
Syphon and dirt collector, must
be completely filled with water.
Make sure there is no residual air
inside, before connect them to
the boiler.
Connect the pipe (L) to the bottom
of the condensate receptacle (M).
The connection to the draining
system should always be done
with an open connection, in order
to avoid a flooding of the boiler in
case of a blocked drain.
Perform an inspection and cleaning
regularly
WARNING - SAFETY INSTRUCTION
Do not remove or re-position the
metal ring (N) in the dirt collector .
WARNING: Do not remove the metal
ring for any reason.
If the ball of syphone (N) is in the dirt
collector (7) shut off the boiler and
call an authorized technical center.
N
OK
WARNING
NOT OK
EN -
Operation and Installation manual
A
C
H
L
N
D
C
B
E
M
M
7
8
7
27

Publicidad

Tabla de contenido
loading

Tabla de contenido