4. Make sure surfaces to be painted are clean.
Note:
• DO NOT cut Grommets in rails.
Fig. 1
Step 3:
Apply Spray Paint To Cut Areas
1. Using a piece of cardboard as a mask, apply the 1
Fortress zinc based touch-up paint.
2. Allow to dry before applying second coat.
3. Apply the 2
4. Allow to dry and install.
Fig. 1
2X
PANEL INSTALLATION
Step 1:
Install I-Support On Panel (When Required By Local Code)
1. Position Vertical Support(s) so that they are centered or
equally spaced across the bottom rail.
2. Replace the 5/16" [8mm] Hex Bolt that secures the Vertical
Support to the Bottom Rail with the I-Support assembly.
12
Fig. 2
coat of Fortress zinc based touch-up paint.
nd
V-SERIES: VERTICAL CABLE INSTALLATION
Fig. 3
coat of
st