fortress V Serie Instrucciones De Instalación página 24

Ocultar thumbs Ver también para V Serie:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

Note:
• It is recommended to use taller posts for stair installations.
For 34" [864mm] high panels, use 45-1/2" [1156mm]
posts. For 40" [1016mmm] high panels, use 55" [1397mm]
tall posts.
STAIR BRACKET: PACKAGING REMOVAL
Step 1:
Remove Panel From Packaging
1. The Vertical Cable Rail Stair Panel is packaged with a
disposable upright at each end of the panel. Remove this
upright only when you are ready to install the panel.
As shown in Fig. 1 below.
Note:
• Installation of the Vertical Cable Rail Stair Panel requires
an additional screw in each UB-05. The bag with the
4 screws is attached to the panel. DO NOT DISCARD.
Fig. 1
Disposable
Upright
STAIR BRACKET: BRACKET INSTALLATION
Step 1:
Bottom Bracket Installation
1. Position wood 2" x 4" (actual 1-1/2" [38mm] x 3-1/2"
[89mm]) between posts. As shown in Fig. 1.
2. Assemble the UB-05 Adapter by tightening the Barrel
& Screw, then attach the UB-05 Cup with Phillips Head
Thread-Cutting Screws. As shown in Fig. 2.
24
V-SERIES: VERTICAL CABLE INSTALLATION

Publicidad

Tabla de contenido
loading

Tabla de contenido