Step 3:
Apply Spray Paint To Cut Areas
1. Using a piece of cardboard as a mask, apply the 1
Fortress zinc based touch-up paint.
2. Allow to dry before applying second coat.
3. Apply the 2nd coat of Fortress zinc based touch-up paint.
4. Allow to dry and install.
Fig. 1
2X
STAIR BRACKET: PANEL INSTALLATION
Step 1:
Install Panel
1. Rake the panel near to the angle needed to install.
2. Drop the panel down into the brackets. As shown in Fig. 1
below.
3. Remove any metal shavings after attaching the panel.
Fig. 1
Step 2:
Attach Panel to Brackets
1. Pre-drill holes for screws using a 3/16" [5mm] drill bit.
2. Push the bracket up so that the bottom is parallel with the
rail.
V-SERIES: VERTICAL CABLE INSTALLATION
coat of
st
31