3.
Installation
3.1.
Preparation for on-site installation
After removing the transport packaging, the following checks must be carried out in advance to
the on-site installation:
Inspection of the nameplate information and alignment with the operating conditions of
the machine or application system for which the diaphragm accumulator is intended.
Comparison of the name plate data with the details of the declaration of conformity.
Visual inspection to exclude transport damage of the vessel, gas and oil port connections
as well as any indication of corrosion or other surface damage.
Await sufficient temperature compensation of the accumulator with the ambient conditions
at the installation site.
DANGER:
Before assembly, ensure that the hydraulic system is pressure free. Incorrect
assembly may result in serious accidents.
3.2
General arrangement and system integration
The installation location can be where desired. An installation space of 200 mm should be
maintained above the gas port for a testing and filling device.
3.3.
Installation and fastening
The accumulator must be fixed such that it is securely held in place in the event of vibrations caused
by operation or any break in the connection line and such that the accumulator will not be affected
by any tensions.
14