peerless-AV PLA 50-UNL Manual De Instalación página 8

Ocultar thumbs Ver también para PLA 50-UNL:
Tabla de contenido

Publicidad

Idiomas disponibles

Idiomas disponibles

• If you are uncertain that product is properly installed, call customer care.
2
Note: There are five mounting positions. The
center position is shown (right). Slide washer (J)
over wall support arm axle (D). Next, insert plastic
cap (N) into axle. Then, insert holding pin (M) into
axle. See detail 1.
2-1
Place arm assembly (C) with washer (J) into wall
plate (A). Insert axle assembly shown in detail 1
through wall plate (A), arm assembly (C), and
washer (J). Lock axle in place by aligning holding
pin (M) with notches shown in detail 2.
2-2
Insert socket cap screw (K) into hole at bottom of
wall support arm axle (D) as shown in detail 3.
Tighten screw using 9/64" allen wrench (Q).
Note: Fit of axle (D) into wall plate (A) and arm
assembly (C) will be tight. Gently tap into place
with a hammer if necessary.
3
Snap four cable management clips (R) into top or bottom of arm assembly (C) as shown. Cable ties (S) are used with
clips for cord management.
3-1
Slide one mesh sleeve (T) over each cable. Use cable ties (S) to tighten mesh sleeves to cables.
WARNING
R
C
S
8 of 39
N
J
D
M
A
C
J
K
DETAIL 3
ISSUED: 06-05-06 SHEET #: 202-9140-5 12-12-06
DETAIL 1
NOTCH
DETAIL 2
D
T

Publicidad

Tabla de contenido
loading

Este manual también es adecuado para:

Pla 50-unl-sPla 50-unlpPla 50-unlp-sRtpla 50Rtpla 50-s

Tabla de contenido