中文
AE5301S/AE5301-3S
EN
DE
RU
KO
PT
JA
ES
Chapter III Preparation for installation
3.1 Unpacking
All packing, loading/unloading, transportation and unpacking operations must be performed by professional personnel.
Transportation:
The scissor lift shall be loaded/unloaded and moved by a lifting machine and forklift with capacity over 3 tons. To prevent the scissor
lift falling off, one person shall pay attention to the scissor lift during the lifting operation for fear of accidents. The scissor lift shall be
transported by an automobile or ship.
The lift shall be inspected for completeness when it arrives, for fear of damage or loss during transportation. If the packing box is broken
during transportation, inspect the broken box according to the Packing List, confirm the damaged articles and lost components, and at the
same time, inform the carrier immediately.
The lift is heavy! Therefore, manpower loading/unloading and handling are forbidden. Safety is of much importance. In addition, the hoisting
of lift during loading/unloading shall be operated as illustrated.
Storage:
Machinery equipment shall be stored in an indoor warehouse, and waterproof treatment shall be adopted in case of outdoor storage. A van
truck shall be used for highway transportation, and a container for waterway transport. The control cabinet must be placed upright during
transportation, and be protected from squeezing by other goods.
44