Descargar Imprimir esta página

Stanley QED300 Manual Del Usuario página 5

Dispositivo de salida rápida de vara vertical de superficie

Publicidad

Idiomas disponibles

Idiomas disponibles

8
8C
8B
8 END CAP INSTALLATION
Bracket hole locations can be marked by using template or by aligning Bracket (8A) on the end of Exit Device (8B). Insert End Piece (8C) of Bracket (8A) to end of Exit Device (8B) and mark
screw hole centers with a Pencil or Awl (8D). Remove Bracket (8A) and drill holes on door markings. Refer to template for hole size dimensions. Secure Bracket (8A) to door with appropriate
Screws (8E). Install End Cap (8G) with screw provided (8F).
9
9B
9B
9 BOTTOM & TOP BRACKET INSTALLATION
Remove Covers (9A) and Brackets (9B) from top and bottom Latch Assemblies (9C). Place both top & bottom Brackets (9B) onto door and aligning mounting holes with holes drilled. Mount
Brackets (9B) with appropriate Screws (9D).
10
10B
10A
10B
10 BOTTOM STRIKE INSTALLATION
Cut a 1 5/32" [29 mm] X 29/32" [23 mm] Rectangular Hole (10A) with hole depth being 11/16" [21 mm] deep on hole marking as shown on template. Drill two 1/2" [13 mm] dia. X 7/8" [22 mm]
deep Holes (10B) on hole markings as shown on template. Refer to template for hole size dimensions. Insert Anchors (10C) onto Holes (10B) and Strike (10D) onto Rectangular Hole (10A)
and secure with Screws (10E).
8B
8A
8D
9C
9C
FLOOR
SURFACE
10A
8A
8C
9B
9A
DOOR
9A
9B
DOOR
10D
10A
10B
5 / 20
8B
8E
8E
8A
9D
9D
10E
10C
FLOOR
SURFACE
8F
8G
FLOOR
10E
SURFACE
10D

Publicidad

loading