Install Bottom Latch (11A) to Bottom Bracket (11B) and loosely attach with provided Screws (11C) to the Bottom Slots (11D) of Bracket (11B). Adjust and align Latch (11A) to eliminate interference
with bottom strike or ?nished ?oor. Tighten Screws (11C) to secure Latch (11A). Screw threaded end of Rod (11E) half way onto Bottom Latch Pin (11F). Lift Rod (11E) up and down to test the
latch spring resistance. Lift and rotate Rod (11E) up to connect the Top End (11G) of rod with Chassis Actuating Plate (11H). Attach Top End (11G) of rod to Chassis Actuating Plate (11H) by
using the provided Screw (11J). Test mechanism by depressing the Push Bar (11K) on the Exit Device and making sure that the Bottom Latch (11A) clears the bottom strike or ?nished ?oor.
12
12A
12C
12C
12D
12D
12 TOP STRIKE & TOP LATCH INSTALLATION
Place Top Strike (12A) onto top face of Door Jamb (12B) using only the two Outer Holes (12C). Align mounting holes with holes drilled and secure with provided Screws (12D). Install Top Latch
(12E) to Top Bracket (12F) and loosely attach with provided Screws (12G) to Top Slots (12H) of Bracket (12F). Adjust and align Latch (12E) with Top Strike (12A) and secure by tightening Screws
(12G). Mark and drill third Hole (12J) on Top Strike (12A) as shown. Refer to template for hole size dimensions. Install Screw (12K) into third Hole (12J) of Top Strike (12A).